Factors That Determine Steam Loss

  • Orifice size: Larger orifice = more steam lost. A 5mm orifice wastes ~2.8x more steam than a 3mm orifice at the same pressure.
  • Steam pressure: Higher pressure = higher steam density = more mass lost per unit of volume flow.
  • Operating hours: A trap that operates 24/7 wastes 3.5x more steam than one that operates 8 hours/day.
  • Back pressure: Higher condensate return pressure reduces the differential pressure across the trap, reducing steam loss.

Quick Reference Table

Approximate steam loss (kg/hr) for a fully failed-open trap at various pressures and orifice sizes:

Orifice Size3 bar7 bar10 bar15 bar
2 mm~2 kg/hr~4 kg/hr~5 kg/hr~7 kg/hr
3 mm~5 kg/hr~9 kg/hr~12 kg/hr~16 kg/hr
5 mm~13 kg/hr~24 kg/hr~33 kg/hr~44 kg/hr
8 mm~33 kg/hr~62 kg/hr~84 kg/hr~113 kg/hr

Annual Cost Examples

Assuming steam costs $0.02/kg and the plant operates 8,000 hours/year:

OrificePressureSteam LossAnnual Cost
3 mm10 bar12 kg/hr~$1,920/year
5 mm10 bar33 kg/hr~$5,280/year
8 mm10 bar84 kg/hr~$13,440/year
5 mm15 bar44 kg/hr~$7,040/year

The multiplier effect

If 15% of your 100 traps are failed open at an average of $4,000/year each, that's $60,000/year in wasted energy. A trap survey and replacement program typically costs $5,000–$10,000 — the payback is less than 2 months.

Hidden Costs of Failed Traps

  1. Increased boiler fuel consumption — the boiler must produce replacement steam for what's wasted.
  2. Higher condensate return temperature — wasted steam pressurises the return system.
  3. Reduced system capacity — wasted steam may cause boiler to operate at maximum output, limiting capacity for process needs.
  4. Other traps may fail — elevated back pressure in the condensate return system can cause other traps to fail.
  5. Environmental impact — wasted fuel means unnecessary carbon emissions.

Tip: Track your boiler fuel consumption per tonne of steam produced. A gradual increase over time often indicates an increasing number of failed steam traps.

Digitise your maintenance with PlantLogica

PlantLogica connects to your equipment sensors via PLC, schedules preventive maintenance, logs work offline by voice in the field, and uses AI to predict failures before they happen.