Heat Exchanger Inspection
Regular inspection of heat exchangers prevents failures and maintains efficiency. Learn what to inspect, how to detect fouling and leaks, and when to schedule cleaning.
Performance Monitoring
- Calculate U value: Measure inlet and outlet temperatures and flow rates on both sides. Calculate the actual U value. Compare to the design U. A 20% drop indicates fouling.
- Monitor approach temperature: The difference between hot outlet and cold inlet temperatures. Increasing approach means decreasing efficiency.
- Monitor pressure drop: Increasing pressure drop on either side indicates fouling or blockage. Compare to baseline.
- Check for cross-contamination: Sample the cold fluid for traces of the hot fluid. If present, tubes or plates are leaking.
External Inspection
- Visual check: Look for external leaks at flanges, gaskets, and casing. Check for corrosion, paint damage, and insulation deterioration.
- Check for vibration: Excessive vibration indicates tube bundle looseness, flow-induced vibration, or support failure.
- Check connections: Verify all instrument connections (temperature, pressure) are functional and calibrated.
- Inspect insulation: Damaged insulation causes heat loss and can allow water ingress, causing external corrosion.
- Check supports: Verify the exchanger is properly supported. Thermal expansion must be accommodated by sliding supports.
Internal Inspection (Annual)
- Isolate, drain, and lock out the exchanger.
- Remove covers or pull the tube bundle (shell and tube type).
- Inspect tube surfaces for scale, corrosion, and pitting. Use a borescope for inaccessible tubes.
- Inspect the shell side for deposits, corrosion, and baffle damage.
- Check tube-to-tubesheet joints for leaks. Hydrostatic test if necessary.
- Inspect gaskets and replace if degraded.
- For PHE: inspect plates for cracks, distortion, and gasket condition.
- Measure tube wall thickness at suspect areas. Replace tubes with significant thinning.
- Clean fouled surfaces. Use chemical cleaning for scale, mechanical cleaning for sediment.
- Reassemble, pressure test, and record findings in the maintenance log.
Tube plugging
If a tube is leaking or severely corroded, it can be plugged at both ends rather than replaced. This is a common field repair. However, each plugged tube reduces heat transfer area. If more than 10% of tubes are plugged, the exchanger may need retubing or replacement.
Tip: Trend the U value and pressure drop for each heat exchanger. When U drops 20% from baseline or pressure drop increases 50%, schedule cleaning. Don't wait for performance to drop so far that production is affected. PlantLogica's sensor monitoring can automate this trend analysis.