Cooling Tower Maintenance Guide

Proper cooling tower maintenance prevents Legionella, maintains efficiency, and extends equipment life. This checklist covers daily, weekly, monthly, and annual maintenance tasks.

8 min readUpdated July 2026

Daily Checks

  • Check water level in the basin — top up if low. Verify the make-up water valve is operating correctly.
  • Check the biocide dosing system — verify it's dosing and the chemical levels are adequate.
  • Check conductivity controller — verify it's maintaining TDS within the set range and operating the blowdown valve.
  • Check for unusual noise or vibration from the fan and motor.
  • Inspect the drift eliminators for damage or blockage.
  • Check the water distribution system — verify all nozzles are spraying evenly.
  • Record water treatment chemical consumption.

Weekly Tasks

  • Test water for pH, conductivity, and biocide residual — adjust treatment as needed.
  • Check the fan bearings for noise and temperature.
  • Inspect the fan belt for tension and condition (belt-driven towers).
  • Check the motor amperage — compare to nameplate FLA.
  • Inspect the fill media for scaling, biofouling, or damage.
  • Clean the basin strainer.
  • Check for air leaks in the fan housing and water distribution system.

Monthly Tasks

  • Microbiological testing — Heterotrophic Colony Count (HCC). Target: below 10,000 CFU/mL.
  • Legionella testing (quarterly minimum, monthly for high-risk sites).
  • Inspect and clean the water distribution nozzles — remove blockages.
  • Check the structure for corrosion — especially on steel towers.
  • Inspect the fan hub and blades for cracks or erosion.
  • Lubricate fan bearings and motor bearings (if not sealed).
  • Check the make-up water valve and float valve for correct operation.
  • Record and trend water treatment data.

Annual Maintenance

  1. Drain and clean: Drain the entire system. Physically clean the basin, fill media, drift eliminators, and water distribution system. Remove all sediment, biofilm, and scale.
  2. Disinfect: Hyperchlorinate the system with 5–10 ppm free chlorine for 4–8 hours, then flush.
  3. Inspect the fill: Check for degradation, scaling, and biofouling. Replace damaged fill sections.
  4. Inspect the drift eliminators: Replace if damaged or excessively scaled. Damaged eliminators increase drift and Legionella risk.
  5. Service the fan and motor: Check bearings, belts, alignment, and balance. Replace worn components.
  6. Inspect the structure: Check for corrosion, loose fasteners, and structural integrity. Paint or treat corrosion on steel towers.
  7. Calibrate sensors: Calibrate the conductivity sensor, pH sensor, and biocide dosing system.
  8. Review the water treatment programme: Adjust chemical dosing rates based on the year's operating data.

Key Performance Indicators

ParameterTarget
Heterotrophic Colony CountBelow 10,000 CFU/mL
LegionellaBelow detection limit
pH7.5–9.0
ConductivityPer cycles of concentration (typically 1,000–3,000 µS/cm)
Free chlorine0.5–1.0 ppm (continuous)
Approach temperature (cold water vs wet bulb)3–5°C
Range (hot vs cold water)5–10°C
Cycles of concentration3–6 (depending on water hardness)

Digitise your maintenance with PlantLogica