Guide
Cooling Tower Maintenance Guide
Proper cooling tower maintenance prevents Legionella, maintains efficiency, and extends equipment life. This checklist covers daily, weekly, monthly, and annual maintenance tasks.
8 min readUpdated July 2026
Daily Checks
- Check water level in the basin — top up if low. Verify the make-up water valve is operating correctly.
- Check the biocide dosing system — verify it's dosing and the chemical levels are adequate.
- Check conductivity controller — verify it's maintaining TDS within the set range and operating the blowdown valve.
- Check for unusual noise or vibration from the fan and motor.
- Inspect the drift eliminators for damage or blockage.
- Check the water distribution system — verify all nozzles are spraying evenly.
- Record water treatment chemical consumption.
Weekly Tasks
- Test water for pH, conductivity, and biocide residual — adjust treatment as needed.
- Check the fan bearings for noise and temperature.
- Inspect the fan belt for tension and condition (belt-driven towers).
- Check the motor amperage — compare to nameplate FLA.
- Inspect the fill media for scaling, biofouling, or damage.
- Clean the basin strainer.
- Check for air leaks in the fan housing and water distribution system.
Monthly Tasks
- Microbiological testing — Heterotrophic Colony Count (HCC). Target: below 10,000 CFU/mL.
- Legionella testing (quarterly minimum, monthly for high-risk sites).
- Inspect and clean the water distribution nozzles — remove blockages.
- Check the structure for corrosion — especially on steel towers.
- Inspect the fan hub and blades for cracks or erosion.
- Lubricate fan bearings and motor bearings (if not sealed).
- Check the make-up water valve and float valve for correct operation.
- Record and trend water treatment data.
Annual Maintenance
- Drain and clean: Drain the entire system. Physically clean the basin, fill media, drift eliminators, and water distribution system. Remove all sediment, biofilm, and scale.
- Disinfect: Hyperchlorinate the system with 5–10 ppm free chlorine for 4–8 hours, then flush.
- Inspect the fill: Check for degradation, scaling, and biofouling. Replace damaged fill sections.
- Inspect the drift eliminators: Replace if damaged or excessively scaled. Damaged eliminators increase drift and Legionella risk.
- Service the fan and motor: Check bearings, belts, alignment, and balance. Replace worn components.
- Inspect the structure: Check for corrosion, loose fasteners, and structural integrity. Paint or treat corrosion on steel towers.
- Calibrate sensors: Calibrate the conductivity sensor, pH sensor, and biocide dosing system.
- Review the water treatment programme: Adjust chemical dosing rates based on the year's operating data.
Key Performance Indicators
| Parameter | Target |
|---|---|
| Heterotrophic Colony Count | Below 10,000 CFU/mL |
| Legionella | Below detection limit |
| pH | 7.5–9.0 |
| Conductivity | Per cycles of concentration (typically 1,000–3,000 µS/cm) |
| Free chlorine | 0.5–1.0 ppm (continuous) |
| Approach temperature (cold water vs wet bulb) | 3–5°C |
| Range (hot vs cold water) | 5–10°C |
| Cycles of concentration | 3–6 (depending on water hardness) |