Continuous Blowdown vs Bottom Blowdown

Blowdown controls dissolved solids in boiler water. Learn the difference between continuous (surface) blowdown and intermittent (bottom) blowdown, and when to use each.

5 min readUpdated July 2026

Surface (Continuous) Blowdown

Surface blowdown removes water from just below the surface of the boiler water, where dissolved solids concentrate as steam is produced. By continuously bleeding a small amount of water, TDS (total dissolved solids) is maintained at the target level.

Surface blowdown is typically automated with a conductivity-controlled valve that opens when TDS exceeds the setpoint and closes when it returns to the target. This is the most efficient method of TDS control because it removes the most concentrated water with minimal heat loss.

  • Controls: TDS (dissolved solids concentration).
  • Frequency: Continuous or intermittent based on TDS measurement.
  • Heat recovery: Surface blowdown is hot and can be passed through a heat exchanger to preheat feedwater, recovering 60 to 80% of the heat.

Bottom (Intermittent) Blowdown

Bottom blowdown removes water from the lowest point in the boiler, where sludge and sediment settle. This is done manually by opening a quick-opening valve at the bottom of the boiler for a few seconds, discharging accumulated sludge.

Bottom blowdown does not effectively control TDS because the water at the bottom of the boiler is not representative of the overall dissolved solids concentration. Its purpose is to remove settled solids that surface blowdown cannot reach.

  • Controls: Sludge and sediment accumulation.
  • Frequency: Typically once per shift or daily, depending on water quality.
  • Duration: Short bursts (5 to 10 seconds). Long blowdown wastes energy and can disrupt boiler circulation.

Key Differences

FeatureSurface BlowdownBottom Blowdown
LocationNear water surfaceBottom of boiler
What it removesDissolved solids (TDS)Settled sludge and sediment
Control methodConductivity controllerManual, scheduled
FrequencyContinuous or automaticOnce per shift or daily
Volume per eventSmall, continuousShort burst, larger flow
Heat recoveryYes, via heat exchangerDifficult (intermittent, high flow)

Best Practice: Use Both

A well-operated boiler uses both methods. Continuous surface blowdown with conductivity control and heat recovery manages TDS efficiently. Regular bottom blowdown removes accumulated sludge that surface blowdown cannot reach.

Bottom blowdown should be performed with a quick-opening valve, opened fully for 5 to 10 seconds, then closed. The rapid flow stirs up and evacuates sludge. Slow or partial opening is ineffective and wastes water and energy.

Never open bottom blowdown on a boiler with low water level

Opening the bottom blowdown valve when water level is low can expose boiler tubes to the furnace heat without water cooling, causing immediate overheating and tube failure. Always verify normal water level before blowing down.

Tip: If you are doing bottom blowdown more than once per shift, your feedwater treatment may be inadequate. Have a water treatment specialist review your chemical dosing and feedwater quality.